Projects

Twin Peaks Trail

For the San Francisco Recreation and Park Department

On this project, Campbell Grading, Inc., demolished 830 linear feet of timber stairs and built and installed 620 linear feet of 4- and 5-foot-wide box steps. We constructed new trail alignments and full cut bench.

Then we surfaced the box steps, landing, and new alignments with Park Tread® surfacing. We also also built stringer stairs and installed silt fence, weed-free wattles, and erosion control coconut fiber netting.