By liz | Tue, 08/24/2010 - 14:52 |
Tags:
Campbell Grading, Inc. has completed the construction of eight step pools that were built to stabilize a large erosion gully up-stream from the Redwood Creek alluvial fan. Approximately 350 tons of rock in a variety of sizes (1/2 ton, 1/4 ton, head-size, and 3-9" rock) was used to construct the step pools.

