By bridgett | Fri, 01/13/2012 - 09:26 |
Tags:
Liz, our project manager, inspecting the formwork.

The overlook forms receiving concrete.


Adding the donor lettering to the center of the overlook.

The connector stair at the covered way received concrete footings.
