Muir Beach & Redwood Creek Alluvial Fan Restoration Project. Completed Fall 2010.

News & Updates

A Beautiful Place to Work

Soon the public will be able to enjoy these views as well.

The Golden Gate Overlook is taking form through Golden Bay Construction

Liz, our project manager, inspecting the formwork.

The overlook forms receiving concrete.

Adding the donor lettering to the center of the overlook.

Extension Trail

An extension trail was added to our Presidio Coastal Trail & Golden Gate Overlook project, in order to make a smooth transition from the new work, created by Campbell Grading, Inc., to the existing trail that parallels Lincoln Blvd and the ocean. The trail also addresses the erosion problem caused from the street run-off.

H-beam Wall Moving Along

The H-beam wall beams have been put in place and the wall has been backfilling with gravel wrapped with fabric.

Wolfback Ridge Road Improvements

Battery East Parking Lot Stockpile

Battery East Parking Lot Stockpile

 

Golden Gate Overlook Structural Slab and Formwork

The form work is underway at the Golden Gate Overlook and the structural slab for the stone has been poured.

 

Golden Bay Construction, our subcontractor, poured 117 cubic yards of concrete for the structural slab at the Golden Gate Overlook.

H-beam Wall Progression

We have continued with building the H-beam wall for the Presidio Coastal Trail and Golden Gate Overlook. The following pictures show our progression over the last week.

The holes for the I-beams were drilled.

 

These piles are the soil that was drilled out of the I-beam holes.

 

Construction has Begun at the Most Southern End of the Presidio Coastal Trail and Golden Gate Overlook Project

We have starting shaping the landscape for the installation of the H-beam wall.

The Lincoln/Merchant Connector Stairs and Behind the Golden Gate Overlook

Behind the Golden Gate Overlook everything is at finished grade and Barth's surfacing has been put down. Erosion control buttons up the area.

Box steps with Barth's surfacing has been put in leading up to the connector stairs at the Lincoln and Merchant Intersection.